Use Of Funds
The main construction content of the project is the renewal and transformation of relevant facilities and equipment for the classified disposal management, collection, transportation and treatment of domestic waste in the whole Weinan High-tech Zone. The specific content includes the renewal of domestic waste collection facilities, the renewal of garbage transportation and sanitation vehicles; the renewal of compression equipment in newly-built garbage transfer stations, and the establishment of a recyclable waste sorting center, a large waste disassembly center and a temporary storage point for hazardous waste.
Return Analysis
After the project is completed, the annual processing volume of domestic waste collection and transportation will increase from 36,500 tons to 63,900 tons, which is equivalent to an average of 175 tons per day; the daily harmless treatment capacity of waste will be increased by 8 tons; the annual recycling volume of waste materials can reach 51,100 tons, which is equivalent to an average of 140 tons per day.
Contact Information
Contact: Cheng Zhanxian
Phone: 0913-2119856