Use Of Funds
The project is located in Longmen Industrial Park of the Economic Development Zone, east of Jinmen Road, west of Fengshan North Road, south of Kuangshan Road and north of Zifeng Street. It covers a planned area of about 216 mu, with a total construction area of about 63,700 square meters. It mainly includes the construction of 3 Class 戊 (Class E) factory buildings, 3 finished product warehouses, 1 general factory building, water pump houses, station buildings, building materials purification areas, comprehensive service buildings, etc. At the same time, photovoltaic power generation facilities will be built on the roofs of the factory buildings, with a total installed capacity of about 5.8MW, and relevant public and auxiliary facilities will be constructed accordingly.
Return Analysis
According to the expected revenues and expenditures of the project within the calculation period, the project can generate a continuous and stable net cash flow. According to the balance result of the capital measurement under the expected conditions, the net income during the project operation period is 54,684,500 yuan. The implementation of this project can bring good profit returns to investors. After the capital is invested in this project, the capital can be recovered relatively quickly, and it has an ideal profitability and solvency.
Contact Information
Contact: Zheng Jiahui
Phone: 13649256509