PROJECT RESOURCE LIBRARY
Project Resource Library

Project Introduction

2GWh sodium ion battery production project

China Communications Group First Harbor Engineering Survey and Design Institute

China Communications Group First Harbor Engineering Survey and Design Institute

2025-05-11

77 Share

Funding Requirements

1.2 billion yuan

Project Details

Use Of Funds
The project is planned to cover an area of 100 mu, with a total construction area of 11 20000 square meters. It mainly constructs the cell plant, finished product warehouse, waste warehouse and soaking pool, fire station building and monitoring room, sewage treatment station, power station, electrolyte warehouse, NMP pump room, NMP Tank farm, raw material warehouse, safety laboratory, waste treatment station, pilot plant, R&D testing, accident pool, initial rainwater collection pool, corridor, cell plant, electrolyte warehouse complex building, gatekeeper. Introduce battery production line and produce sodium ion battery production line, including raw material preparation, module packaging and other links.
Return Analysis
It is estimated that the annual output value is about 2.5 billion yuan, driving 2000 jobs.
Contact Information

Contact: Zhu Qing

Phone: 13991121199

Prev: Lotus Secret Ecotourism Scenic Spot Project Next: Xianyang Zero Carbon Smart Park Construction Project
The Silk Road International Exposition serves as a high-level open platform focused on enhancing connectivity and expanding economic cooperation. It actively contributes to the development of the New Western Land-Sea Corridor while deepening trade, investment, and collaborative exchanges with countries in Central Asia, West Asia, and South Asia, as well as with provinces and municipalities across China.
Exhibition Venue: Xi'an, China
Exhibition Dates: May 21-25, 2025
Organizing Committee of the Silk Road International Exposition:
Fax: (029)87226080
Email: ewit@onlinew.com.cn
Postal Code: 710004
Organizers:
Guest Of Honour:

Official WeChat Account